This deck required repairs to the stairs and areas of the main portion of the deck. Professional hardwood floor refinishers were brought in to heavily sand the surfaces. This was followed by preparation which included priming the railings with Mad Dog,then coating them in California 2010. Deck boards, top railing board, and stairs were painted with One Time Wood in clove brown.
2024 © Drill Theme | Designed by Sunpoint